WI DOT Streets Projects in Monona

Yahara Bridge (Hwy 12/18):
WI DOT
will be performing a project to repave the HWY 12/18 bridges over the Yahara River in Monona.  Both Beltline bridges over the Yahara River will receive a polymer deck overlay to preserve and extend the life of the bridges.  

Project Website

HWY 51 Road Surface Rehabilitation
WI DOT
 will be performing grading, concrete pavement patching, base aggregate, HMA pavement, erosion control, guardrail, pavement marking, signing and traffic control along HWY 51 from Broadway Ave. to Milwaukee St. along the southbound lanes.  These operations are slated to start on 4/24/2017.