New Structure / Addition | $0.17 per sq. ft. |
Erosion Control | $200 for the first acre then $100 per additional full or part acre 1 acre = 43,560 sq. ft. |
Driveways
| Right of way permit required |
Remodel, Reroof | $0.11 per sq. ft., plus mechanicals $165 minimum |
Occupancy Temporary Occupancy Change of Use Permit | $75 per unit |
Plumbing | $55 base fee plus $0.10/sq. ft. $110 minimum |
Electrical | $55 base fee plus $0.10/sq. ft. $165 minimum |
HVAC | $55 base fee plus $0.10/sq. ft. $110 minimum |
Commercial Plan Review | Certified Municipality per SPS TABLE 302.31-2 |
Early Start Permit | $175 |
Razing Fee | $100 for the first 1,000 sq. ft. of floor area $75 per 1,000 sq. ft. of floor area thereafter |
Miscellaneous Fees | Minimum permit fee: $50 Re-inspection fee: $50 each Failure to call for inspection: $50 each Double fees are due if work is started before the permit is issued |